Platform / 03 Estimating

Priced by your own recipes.

Quantities flow from the takeoff into the cost recipes you build once (crews, production rates, materials, equipment and trucking), with margin on every line.

56takeoff quantities a service can bill from: area, curb, stalls, arrows and more
11no-code recipe calculations: tons from depth, coverage, per crew day…
7 cost typescrews, equipment, materials, trucking, subs, overhead and misc in one price book
To the centservice prices always add up to the proposal total
Your price book

01 · Your price book

Set your costs once. Every bid copies from it.

The TruTec price book: materials, equipment, crews, trucking, subs, overhead and misc
Hot-mix asphalt vendor prices over time from three plants

One catalog for every cost

Labor, materials, equipment, trucking, subs, overhead and misc in one library every estimate copies from.

Crews, people and burden

Price a crew as one rate or its people: wage, burden, overtime, workday length and licences.

Prevailing-wage rate sets

Give people a second wage, like prevailing wage, and switch a whole estimate to it.

Materials that buy like you do

Specs and sizes, density for tons from depth, waste, pack sizes, rounding, tax class and SKU.

Vendor prices and history

Each supplier’s price with quantity breaks and dates, a preferred supplier and a price-history chart.

Equipment and fleet

Owned or rented, by the hour, day or flat, with fuel. Linked to the real trucks you dispatch.

Trucking and hauling order

Per hour, day, ton or load, with mileage bands. Your own trucks go first, then brokers in order.

Subs, overhead and misc

Subs priced ten ways with markup; overhead per day, hour or percentage; dump fees and permits auto-added.

Vendor and sub directory

Suppliers, rental houses and subs on a map, with contacts, categories and every price they’ve quoted.

Cost codes

Your job-cost codes on services and materials, with uncoded lines flagged on the estimate.

Spec sheets and mix designs

Attach MSDS, spec sheets and mix designs to materials and services, ready for the proposal.

03.1
Services that price themselves

02 · Services that price themselves

Build “2-inch overlay” once. Reuse it on every bid.

A service cost recipe: asphalt patching with a depth option, tonnage from depth, crew, equipment and trucking

Five-step service builder

Identity and takeoff link, cost recipe, proposal wording, pricing and subservices. No code.

Billed from the takeoff

Point a service at a measured quantity and it fills itself in, with a warning if an area would count twice.

No-code recipe math

Tons from depth, coverage factors, percent of another material, one per X, per crew day and more.

Types and options

Depth, finish, coats: each combination becomes its own priced type, with its own proposal wording.

Field questions

Ask the salesperson questions on the takeoff. Answers become notes on the line, never a price change.

Production rates

SY a day, tons an hour, LF a day: crew hours and job days work themselves out.

Recipe, unit or cost-plus

Price from the recipe with markup or margin, or per unit with volume price breaks.

Minimum charges

Minimums per service, per type and per job, or one shared minimum per service.

Subservices and bundles

Group subservices under a parent so the customer sees one line, and ask before optional ones are added.

Automatic add-on rules

Put a service on every estimate, remind estimators about add-ons on big jobs, and auto-size followers.

Variables and lookup tables

Reusable inputs, formulas, lookup tables and a library of coverage rates like “1 gal per 80 SF”.

Price lists

Columns for counties, cities or customer tiers. Paste the grid from Excel and pick one per estimate.

Takeoff item catalog

One list of everything you measure (25 standard paving items plus your own), feeding services directly.

Starter service library

Install ten common paving services in a click: units, takeoff links and wording, with your own costs.

Bids that don’t move

Estimates keep their prices when the catalog changes; a banner shows the difference and updates on request.

03.2
Takeoff to bid

03 · Takeoff to bid

Measured on the map. Priced on the sheet.

An estimator reviewing the Oak Hollow Plaza estimate in TruTec, with the sealcoat line opened

Services panel on the takeoff

On the map, your services show what was measured. Apply puts them on the estimate.

Auto-add measured services

Optionally, everything the takeoff measured lands on the estimate when the draft opens.

Site-walk quantities

Work logged on the site assessment shows in a bar with one-click Add to estimate.

Takeoff changes, reviewed

A changed takeoff becomes a new quantity version you accept or reject, never a silent overwrite.

Takeoff preview beside the sheet

Open the map next to the estimate; point at a line and its measured shapes light up.

Nothing left off

Painted lines and marks with no type are flagged, so nothing measured is missed on the bid.

Areas and phases

Split one bid into areas or phases, each fed by a takeoff, a site walk or typed quantities.

Estimate templates

Save a finished estimate as a template and start new jobs from it, or swap a draft onto another.

Live estimates board

Every open bid on a map with the pipeline total and average bid, sorted by price or distance from your yard.

Irrigation zone quantities

Heads and lateral pipe per zone from irrigation plans, ready to bill.

03.3
Pricing control

04 · Pricing control

Type the number you want. The bid re-solves.

The Oak Hollow Plaza estimate with the two-coat sealcoat line opened: crew, sealer, spray rig and trucks, each with cost, margin and price

Spreadsheet-style estimate

Every service with its crew, equipment, material, trucking and sub lines: quantity, rate, cost, margin and price.

Margin or markup

Flip the sheet between margin and markup. The dollars stay the same.

Type the number you want

Type over total cost, price, margin or overhead in the footer and every line rescales to hit it.

Targets, group discounts, bulk margin

Set a service’s target price, discount a group, set one margin for a service or hold a line at cost.

Plugs and job overhead

Bid-day adds and cuts with a reason, and itemized or percentage job overhead spread into every service.

Mobilization drive time

Drive hours from your shop to the job, route miles for trucking and a truck-cycle calculator.

Bonds

Percent, fixed or tiered bonds, charged to one service or spread across the bid.

Night and weekend premium

One percentage on the base bid, shown as its own proposal line.

Sales tax by location

Tax areas matched to the job address, tax-exempt jobs, several bid taxes and material tax in cost.

Indirect costs by category

Charges like “3% of labor and equipment”, with how the customer pays and how it spreads.

Options and self-perform vs sub

Mark services optional, and keep a sub comparison line you can swap in with one click.

Metrics you bid by

Cost and price per SF, SY and ton, profit per day, job days, labor hours, or your own formulas.

Rounding that reconciles

Round the proposal to $1, $5, $25 or $100 and service prices still add up to the total exactly.

Undo and redo

Ctrl+Z your own changes on the estimate.

03.4
Vendors & spreadsheets

05 · Vendors & spreadsheets

Supplier prices without phone tag. And your Excel, still working.

Vendor quote leveling: three asphalt plants compared item by item, cheapest in green
The workbook estimator: a paving build priced from the takeoff

Vendor quote requests

Send lines to vendors from your own mailbox; they price each item on a no-login link and attach their bid.

Quote leveling

Items down the side, vendors across, missing and outlier prices flagged. One click puts a price on the bid.

Partner pricing link

Send a sub an expiring link to fill in unit costs; review the price impact before applying your markup.

Excel round-trip

Export the estimate to Excel and import changes back, with every change previewed first.

Your catalog as a spreadsheet

See and edit the whole catalog as a sheet, or download it as a plain-English workbook.

Spreadsheet import

Import rates from a template, your old estimating software’s export or any name/unit/cost sheet.

Workbook estimator

Drop in your own estimating workbook: TruTec recalculates every formula, checks it against your file and prices it from the takeoff.

Sub and vendor agreements

Upload your subcontract once; subs fill it in and sign on a link and upload their insurance certificate.

03.5
After the bid

06 · After the bid

From the estimate, straight into the rest of the job.

The Oak Hollow Plaza estimate: crack fill, two coats of sealcoat, restriping, ADA and arrows priced at $38,871

One click to the proposal

Next: Proposal hides unused items, flags wording blanks and sends the priced services into a branded proposal.

Priced change orders

Price extra work on the same sheet; the customer signs the change order and that approves it.

Work orders from the bid

A one-page production sheet built from the estimate, with tons computed and a PDF for the crew.

Who sees prices

One permission hides costs and prices from a role everywhere: estimates, jobs, schedule and reports.

03.6
Everything

Everything in Estimating

62 things Estimating does. All on the same record as the rest of the job.

Your price book

  • One catalog for every cost
  • Crews, people and burden
  • Prevailing-wage rate sets
  • Materials that buy like you do
  • Vendor prices and history
  • Equipment and fleet
  • Trucking and hauling order
  • Subs, overhead and misc
  • Vendor and sub directory
  • Cost codes
  • Spec sheets and mix designs

Services that price themselves

  • Five-step service builder
  • Billed from the takeoff
  • No-code recipe math
  • Types and options
  • Field questions
  • Production rates
  • Recipe, unit or cost-plus
  • Minimum charges
  • Subservices and bundles
  • Automatic add-on rules
  • Variables and lookup tables
  • Price lists
  • Takeoff item catalog
  • Starter service library
  • Bids that don’t move

Takeoff to bid

  • Services panel on the takeoff
  • Auto-add measured services
  • Site-walk quantities
  • Takeoff changes, reviewed
  • Takeoff preview beside the sheet
  • Nothing left off
  • Areas and phases
  • Estimate templates
  • Live estimates board
  • Irrigation zone quantities

Pricing control

  • Spreadsheet-style estimate
  • Margin or markup
  • Type the number you want
  • Targets, group discounts, bulk margin
  • Plugs and job overhead
  • Mobilization drive time
  • Bonds
  • Night and weekend premium
  • Sales tax by location
  • Indirect costs by category
  • Options and self-perform vs sub
  • Metrics you bid by
  • Rounding that reconciles
  • Undo and redo

Vendors & spreadsheets

  • Vendor quote requests
  • Quote leveling
  • Partner pricing link
  • Excel round-trip
  • Your catalog as a spreadsheet
  • Spreadsheet import
  • Workbook estimator
  • Sub and vendor agreements

After the bid

  • One click to the proposal
  • Priced change orders
  • Work orders from the bid
  • Who sees prices
03
The platform
03

FAQ

Common questions.

Something else? Talk to a human or book a demo

No. Install ten starter services in a click and add your own costs, import rates from a spreadsheet, or drop in your existing estimating workbook and TruTec recalculates it.
Yes. The workbook estimator recalculates every formula in your own workbook, checks the results against the file, and prices it from the takeoff.
Services are tied to measured quantities (56 of them, from area to stalls and arrows), so they fill in from the takeoff. If the takeoff changes, you review the new quantities before anything updates.
Both. Flip the sheet between them and the dollars stay the same. Or type the total, price or margin you want and every line rescales.
Yes. Send a quote request from your mailbox; vendors price each item on a no-login link, and you compare them side by side before one click puts the price on the bid.
Yes. Give people a second wage rate and switch a whole estimate to it; saved bids keep their rates.